Extremely Rapid Turnaround
Rapid turnaround of user requirements validation helped client meet extremely tight timeline.
background
- $8B global market leader in development, marketing and distribution of surgical instruments and devices for use in minimally invasive and open surgical procedures
- client needed to make component material change as part of cost savings initiative
- design change needed to meet specification requirements while ensuring no noticeable difference in end-user experience
client challenges
- no in-house user requirements validation resources available to meet extremely tight timeline
methodology / analyses
- qualitative IDIs with 24 bariatric surgeons
- moderator simulated product in-service with respondents
- surgical simulator utilized to rate each task and characteristic
- tested 14 distinct, separate movements intended to expose any component differences
results
- study successfully completed in three weeks from project kick-off meeting to final report delivery
- test results provided in client’s engineering report format, saving client valuable time
- client able to meet user testing requirements without diverting internal team resources
dd+p difference: seamless integration
The dd+p team was able to integrate with the client seamlessly due to:
- in-depth knowledge of medical device market and customers
- high-level technical expertise of team and moderator
- experienced with client processes and requirements
As a result, dd+p delivered exactly what the client needed within an extremely short period of time.